ASPHALT  CONCRETE  BIDS

OPENED AND TABLED

                   R E S O L U T I O N

            The Board of County Commissioners of Putnam County, Ohio, met in regular session on the 13th day of April, 2010, at the office of said Board with the following members present:  Mr.  John E. Love, Mr. Vincent T. Schroeder and Mr. Travis A. Jerwers.

            Mr. Jerwers      moved the adoption of the following Resolution:

            WHEREAS, This is the date for the opening of sealed bids for the purchase of #448 asphalt concrete and a per CF unit bid for a motorized, self-loading trenching machine.

and

            WHERAS, The following bids were received:

Gerken Materials, 9-072 U. S. 24, P.O. Box 607,  Napoleon, Ohio 43545

Bid bond...............Contract bond, full amount

Line #1,  #448 Type 1M Asphalt Concrete mixed w/ PG 64-22

Per ton................................................$ 53.75 plant location Ottawa

Per ton................................................$ 53.75 plant location Bluffton

Per ton................................................$ 53.75 plant location Auglaize

 

Line # 2,  #448 Type 1M Asphalt Concrete mixed w/ PG 58-28

Per ton..................................................$56.00 plant location Ottawa

Per ton..................................................$56.00 plant location Bluffton

Per ton..................................................$56.00 plant location Auglaize

 

Line # 3, #448 Type 1M Asphalt Concrete mixed w/ MG 10-30

Per ton..................................................$ 59.50 plant location Ottawa

Per ton..................................................$ 59.50 plant location Bluffton

Per ton..................................................$ 59.50 plant location Auglaize

 

Line # 4, #448 Asphalt Concrete base mixed w/ PG 64-22

Per ton..................................................$ 50.50 plant location Ottawa

Per ton..................................................$ 50.50 plant location Bluffton

Per ton..................................................$ 50.50 plant location Auglaize

 

Line # 5, 301 Asphalt Concrete Base mixed w/ PG/64-22

Per ton.................................................$ 49.00 plant location Ottawa

Per ton.................................................$ 49.00 plant location Bluffton

Per ton.................................................$ 49.00 plant location Auglaize

 

Line # 6, Trenching machine

Bid........................................................$8.75 per CY w/operators

 

now therefore, be it

            RESOLVED, The bids be tabled for further study by the Engineer.

            Mr. Schroeder     seconded the motion and the roll being called upon its adoption, the vote resulted as follows: Mr. Jerwers yes        Mr. Schroeder yes Mr. Love yes